Tech Tips
This section first describes briefly the manufacturing process we use for each of our products. It is followed by installation instructions for all of our sign types. Finally, we provide suggested maintenance instructions and our warranty policy.
- Manufacturing Process - HDU Signs (Product Lines 1, 2, and 6)
- Manufacturing Process- Redwood and Cedar Signs (Product Line 3)
- Manufacturing Process - Ceramic Signs (Product Line 5)
- Manufacturing Process - Wrought Iron ( Product Line 7)
- Manufacturing Process - Exotic Wood Nameplates ( Product Line 4 )
- Manufacturing Process - Large Custom Wood and HDU or Wood Signs (Product Line 8)
- Installation Process - Wall Mounted HDU and Wood Signs
- Installation Process - Door Nameplates
- Installation Process - Wall-mounted Ceramic Signs
- Installation Process- L-Bracket Hangers (Models WBS, WBC) for HDU or Wood Sign
- Installation Process - Single Post Stand (Model VPT) and HDU or Wood Sign
- Installation Process - Dual Post Fixed or Chain Stand (Models SDC, CDC, SDF, CDF) for HDU or Wood Sign
- Maintenance (Product Lines 1, 2, 3, 5, 6, and 7)
- Warranty Policy